search archive
browse archive Up

084/085 - Oxford Worcester and Wolverhampton Railway - Droitwich Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Three drawings on one sheet. First drawing is of elevation, second drawing is of section of arches on square, third drawing is of longitudinal section at A.B. Three arch bridge. Main span is 44ft 3" and the side arch spans 33ft 6".

[01 October 1846]

Eight drawings on one sheet. First drawing is of elevation, second drawing is of transverse section, third drawing is of elevation, fourth drawing is of transverse section, fifth drawing is of longitudinal section, sixth drawing is of plan of foundation and plan of superstructure, seventh drawing is of longitudinal section, eighth drawing is of plan of foundation and plan of superstructure.

[01 October 1846]

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan, fourth drawing is of plan of foundations at road line and plan of superstructure showing timber deck, fifth drawing is of sections at E, F, G and H, sixth drawing is of transverse section at C.D, seventh drawing is of side elevation.

[01 October 1846]

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of sections at E, F, G, H, I, J and K, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of side elevation, sixth drawing is of transverse section.

[01 October 1846]

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at road line and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. 25ft 4 1/2" span, 27ft above road.

[01 October 1846]

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of sections at E, F, G and H, sixth drawing is of transverse section at C.D, seventh drawing is of side elevation.

[01 October 1846]

Powered by Preservica
Copyright © Network Rail