032 - Forth Bridge

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

1 drawing showing sections of the junction of strut 3 and tie 4 with top member fixed cantilever

11 September 1886

Drawings showing the vertical column over the Fife and Queensferry piers, and stiffening diaphram at no.15 and 27 circular girders

Undated, circa 1880-1890

1 drawing showing elevations and sections of the Fife approach viaduct to the Forth Bridge.

1882-1890

Two drawings on one sheet showing dimensions of SE caisson. Including textual information and calculations describing: weight when being floated to Garvie; weight when being launched and weight required to sink caisson 37 feet.

1882-1889

1 drawing showing a section through the centre of the vertical tube

1882-1889

24 drawings showing the forces acting on the piers from the vertical supports of the Forth Bridge under deadload, deadload and wind pressure and deadload with live load and wind pressure.

1882-1889

5 charts on one sheet showing Thermometer, Rainfall, Barometer, Wind Pressure and Wind Direction for the year 1884

1884

1 drawing of Forth Bridge Free Cantilever Bay 3 Junction of Vertical Tie with Bottom Member showing sections and elevations

28 March 1887

1 drawing showing progress of construction of Fife north west main pier over five months

13 March 1884

9 drawings showing Trestle at End of Bay 2

1882-1889

4 drawings one sheet Inch Garvie Pier Supporting Columns for Internal Viaduct at Centre of Pier

1882-1889

1 drawing showing Inch Garvie SW Main Pier

23 June 1884

1 drawing showing sections and sectional plans of the cantilever end pier, showing the bearing of the cantilever and approach girders.

1882-1890

1 drawing showing portion of cantilever pier near rail level

16 March 1887

1 drawing showing elevations, sections and plan of connection of cross bracings with vertical column on the Forth Bridge Inch Garvie Pier.

1882-1890

Nine drawings on 1 sheet showing greatest stresses and strains, sections of bridge and plans of bracing of bottom member.

17 May 1883

1 drawing showing elevations and sections of free and fixed cantilever junction of tie 3 and strut 4 with bottom member

24 August 1886

1 drawing of the main south eastern pier of the Forth Bridge showing sections and elevations

30 June 1885

Powered by Preservica