043 - Great Western Railway Contract 4S

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of the Shiventon and Compton Road Bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section.

15 June 1839

Details of bridge. Six drawings on one sheet. Drawing No. 10 for contract No. 4S. First drawing is elevation, second drawing is back elevation and transverse section AB, third drawing is sections at C, D and E, fourth drawing is plan of superstructure, fifth drawing is plan of foundation and sixth drawing is of longitudinal section at FG. Notes on costings on drawings [of building materials].

15 June 1839

Details of bridge No. 27 Shrivenham Road. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section at E.F.

15 June 1839

Details of Bridge. Five drawings on one sheet. Drawing No. 10 for Contract No. 4S. First drawing is of an elevation, second drawing is of back elevation and transverse section at AB, third drawing is of sections at C, D and E, fourth drawing is of plan of superstructure with plan of foundations, fifth drawing is of longitudinal section at FG. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of Bridge. Four drawings on one sheet. Drawing No. 12 for Contract No. 4S. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of transverse section at EF. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of Bridge. Drawing No. 12A for Contract No. 4S. Drawing is of plan of superstructure with plan of foundations. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of bridge. Five drawings on one sheet. Drawing No. 6 for contract No. 4S. First drawing is of elevation and transverse section of AB, second drawing is of transverse section at CD, third drawing is of plan of foundations, fourth drawing is of plan of superstructure, fifth drawing is of transverse section at EF.

15 June 1839

Cross section of line. Drawing No. 2 for Contract No. 4S. Drawing is of a cross section of the land showing embankments and cuttings and details for the line in contract No. 4S starting at North Wilts Canal and passing through Swindon Parish, Stratton St. Margaret's Parish, Stanton Fitz-Warren Parish, Highworth Parish and Shriven[ham]. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of embankments. Two drawings on one sheet. First drawing is of embankment cross section No. 1, second drawing is of embankment cross section No. 2 and No. 3.

15 June 1839

Details of Bridge. Four drawings on one sheet. Drawing No. 11 for Contract No. 4S. First drawing is of an elevation with longitudinal section at AB, second drawing is of transverse section at CD, third drawing is of plan of superstructure with plan of foundations, fourth drawing is of transverse section at EF. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of embankments. Two drawings on one sheet. Drawing No. 4 for contract No. 4S. First drawing is of embankments at cross section No. 1, second drawing is of embankments at cross section No. 2.

15 June 1839

Details of bridge No. 19 Shrivenham Road. Four drawings on one sheet. First drawing is of elevation and longitudinal section, second drawing is of transverse section at C.D, third drawing is of plan of foundation and plan of superstructure, fourth drawing is of transverse section at E.F.

15 June 1839