search archive
browse archive Up

044 - Great Western Railway Contract 3R

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of culverts. Large part of the drawing is missing. Four full drawings remain on page. First drawing is of longitudinal section, second drawing is of transverse section at CD, third drawing is of elevation, fourth drawing is of plan.

May 1838

Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing Is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section at E.F. Signed by Isambard Kingdom Brunel and Richard Custance.

May 1838

Details of cutting and embankment. Three drawings on one sheet. First drawing is of cutting cross section No. 1, second drawing is of embankment cross section No. 1, third drawing is of embankment cross section No. 2. Signed by Isambard Kingdom Brunel and Richard Custance.

May 1838

Details of bridge. Six drawings on one sheet. First drawing is of elevation, second drawing is of transverse section at F.G, third drawing is of sections at A, B and C, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of longitudinal section at D.E, sixth drawing is of elevation at H.I. Signed by Isambard Kingdom Brunel and Richard Custance.

May 1838

Details of bridge. Six drawings on one sheet. First drawing is of elevation, second drawing is of transverse section at F.G, third drawing is of section at A.B.C, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of longitudinal section at D.E, sixth drawing is of elevation at H.I. Signed by Isambard Kingdom Brunel and Richard Custance.

May 1838

Cross section of line. Drawing No. 2 for Contract No. 4R. Drawing is of a cross section of the land showing cross sections and embankment for the line of the railway between Dudcot Parish and Holsey Parish beginning at the road to Dudcot and ending at the River Thames.

May 1838

Details of bridge No. 14 Goring. Six drawings on one sheet. Drawing No. 5 for Contract No. 1R. First drawing is of an elevation, second drawing is of plan of foundations with plan of superstructure, third drawing is of transverse section at AB, fourth drawing is of sections at C, D and E, fifth drawing is of longitudinal section at FG, sixth drawing is of back elevation at HI.

May 1838

Details of culverts. Twelve drawings on one sheet. Drawings one to three are of longitudinal section at A.B, drawings four to six are of transverse section at C.D, drawings seven to nine are of elevations, drawings ten twelve are of plans. Signed by Isambard Kingdom Brunel and Richard Custance.

May 1838

Powered by Preservica
Copyright © Network Rail